IEA Bioenergy
Task 37
Skip navigation
  • Member-Login
  • Casinos Not On Gamstop
  • Casinos Not On Gamstop
  • Non Gamstop Casino Sites
  • Gambling Sites Not On Gamstop
  • Uk Betting Sites Not On Gamstop
  • Non-gamstop Casinos
 
X
Skip navigation
  • About Task 37
    • Contact
    • Members
    • Work program
  • Newsletter
    • Archive
  • News and events
    • News Archive
    • Events
  • Task 37 publications
    • Biogas Handbook
    • Technical brochures
    • Country reports
    • Workshops
    • Success Stories
    • Case Studies
  • Plant Lists
  • Collaboration requests
  • Links
    • National networks
    • Regulations and standards
    • General bioenergy links
  • Downloads
    • Biogas reports
    • Case studies from operators
    • Databases
  • Non Gamstop Casinos
 

Case Studies Provided by Operators

Austrias first feeding of upgraded biogas to the natural gas grid, Pucking, Austria, March 2007 (220.2 KiB)
Wet fermentation: technology for bio-waste, Markgrafneusiedl, Austria, November 2007 (265.5 KiB)
Energy Crop Digestion Plant, Strem, Austria, October 2008 (271.3 KiB)